X

Internal evaluation of disaster risk management

Author: پشتیبان/Saturday, June 30, 2018/Categories: News

Rate this article:
No rating
According to the summer assessment calendar (Bina eye Hospital summer program) on 30 June, All standards related to disaster risk assessment were evaluated by the internal assessment team of the hospital.
Such as: All relevant documentation, Procedures and Instructions, The proposed maneuver scenario of this year and the manning records of last year, Fire prevention measures, Depressors in terms of size and type in different units, Detectors, evacuation paths, Firewall program engine room, List of fire brigade members and familiarity with their job descriptions, Periodic visits to the building, Hospital facilities and equipment, The standards for medical gas and oxygen cylinder capsules, Emergency power generator devices, UPS Power and employee awareness, Early warning system based on the Ministry of Health notification and etc.
The report of the results of the assessment was sent to the members of the Disaster Risk Management Committee members electronically And at the next executive team meeting will be reviewed.

Print

Number of views (1287)/Comments (0)

Please login or register to post comments.
DNN